In the rush to meet exploding demand for cloud capacity and AI infrastructure, data center construction is booming. More and more remote locations are being targeted, putting these centers further from existing utility infrastructure. Power availability often gets the most attention, but water availability and sewer connectivity are rapidly becoming a larger utility access issue.
Data center owners are naturally focusing on water neutrality as a way to deal with this. Water reuse designs are being incorporated that reduce water use by capturing the wastewater generated and treating it for reuse on site. Water neutrality is important and commendable for the long-term operation of the facility, but what about during the construction phase?
Too often, the planning cycle for getting a water source and sewer connection to the site (or developing onsite systems) and incorporating a water neutrality scheme is planned for the end of construction. This leaves the contractors with no choice but to find temporary solutions for their water needs and wastewater generated. Traditionally this means hauling in millions of gallons of water for construction, millions of bottles for drinking, and millions of gallons of sewage hauled away from portable restroom (not to mention the millions of bottles of trash that are created). This is as far from water neutrality as a project can get. But it does not have to be this way.
How Water Neutrality in Data Center Construction Works
Water use and reuse opportunities for a data center and the corresponding “water neutrality” plan usually means operational efficiency — cooling system design, evaporative reduction, and reclamation. But construction itself can and should be water neutral, too.
Here’s what that looks like:
- Onsite potable water production: Treat onsite construction wells to potable status and distribute for temporary office use and for drinking water supply
- Implement onsite chilled water dispensing: Reduce or eliminate bottled water and ice needs with commercial chilled water dispensers around the site.
- Fully functioning restrooms: Use relief facilities with flushing toilets and handwashing sinks to reduce or eliminate portable toilet needs.
- Onsite water reuse: Treat and recycle wastewater directly on the jobsite using state of the art wastewater treatment systems that can generate 98% reuse water for dust suppression, concrete batch plant supply, irrigation, and equipment washdown
This water neutrality plan for construction brings multiple benefits:
- Less truck traffic through the community and on the job site
- Reduces or eliminates the burden on community water and wastewater systems to manage the high levels of water needs and wastewater processing
- Access to fresh drinking water and fully functioning restrooms improves the quality of life of the workforce during the construction period.
The Interim Utility: Bridging the Gap Before Permanent Infrastructure
What makes this plan work is a mobile interim utility provider. That is where WaterFleet comes in. Our systems and service provide the answer to that gap in utility services and allows data center projects to start construction with water neutrality in mind from day one.
Our mobile water and wastewater systems operate as self-contained, monitored infrastructure from day 1 until permanent systems go live.
Phase | Challenge | WaterFleet Solution | ||
Site Prep / Earthwork | No utilities available for dust suppression | Deploy WaterFleet’s Reclaimer systems; treat wastewater onsite for reuse in dust control | ||
Foundation & Structural | High water demand for concrete curing and washdowns | As workforce numbers rise, so does the amount of wastewater. WaterFleet increases treatment capacity to provide reuse treated water to concrete batch plant onsite instead of hauling | ||
|
Workers need clean, safe drinking water and sanitary facilities but no permanent utilities exist |
|
Result: By treating workers’ water and wastewater as critical utilities, you ensure compliance, comfort, and sustainability from day one of construction.
Why Early Water Planning Wins You More Data Center Work
Owners and developers are increasingly scoring bids based on sustainability credentials and risk management. Contractors who address water neutrality in their proposals stand out immediately.
Here’s why it matters:
- You de-risk the project. Early water planning prevents delays, fines, or community pushback.
- You solve the owner’s problem first. Offering construction water neutrality as part of your bid shows foresight.
- You cut costs and improve safety. Less trucking means lower costs and fewer incidents.
Your Competitive Edge: Solve the Problem Before It Becomes One
Data center water issues don’t announce themselves; they creep in quietly as truck traffic, permitting delays, and neighbor complaints.
WaterFleet helps you solve that problem before it gets messy (literally).
Our value proposition:
- Interim utility infrastructure ready to deploy anywhere.
- Reduce or eliminate plastic bottle waste on site.
- 95% water reuse onsite — verifiable and reportable.
- 24/7 monitoring and compliance.
- Fewer trucks, fewer risks, faster builds.
If you want to win more data center work and outshine competitors, start by being water neutral from day one.
Water neutrality isn’t a checkbox for operations; it’s a construction strategy.
When you treat water like power — as a mission-critical utility — you gain control over schedule, cost, and reputation.
Before the power comes on, the water has to flow. And that’s where WaterFleet comes in.